Thursday, May 19, 2011

Stump Removal

Today the 2 citrus stumps and 3 palm tree stumps were removed.
Oh. And the wall, too.



Preschool

Maddy starts preschool in August 3 days a week.
We thought it would be good to get her used to going,
so she is going to summer school at the preschool 2 days a week.
Tuesday was her first day and she did really good!!!
A little sad to be "left" there, but we keep reassuring her that
when we drop her off with her new friends we
will always come back to pick her up.
She did better on Thursday and we're hoping
for more of the same next week!!!

Maddy and Mommy!

Clare had fun too!!

Time for songs with the other kids.

Sissy.

Sissy, Sas, Sassyfras, Goose:

She is so darn happy, loves to wear bracelets, loves her sisters baby....

Oh yeah, she loves to eat.

Autumn Came To Play!!!!!

Last week Autumn's baby brother, Dean, came
home and she got to come up to Phoenix to visit her Grandparents.
That means we got a few hours with her!!!
I only got a few pictures of the girls since they were keeping me busy!

They screamed and squealed the entire car ride.
They cooked.
They played Little People.
They stripped down to nothing and were running around
in the backyard on the splash pad, sliding down the slide
into the splash pad and filling buckets up at the water table
and dumping them out over and over!

Again, with these two, its like no time has passed at all.


See how happy ??

Flooring

This is the tile that is going in the three bathrooms,
the kitchen and laundry room.
The small piece of wood is a very similar sample
color of the cabinets that we ordered.
The other three are the wood floor samples that
we have narrowed it down to...

Hall Floor Repair

Our house has two additions on either end.
The end that has a bedroom and bathroom slopes
and when the tile was removed it was
really bad so Greg and Big Greg put a leveler on the floor.
The stuff basically flows until it stops and makes the floor level!!



Hall Bath Update

The tile is up in the shower, next is to tile the
wall and then grout, grout, grout!!!

After day one.



Day two.

Up close.

Friday, May 13, 2011

Stats

Last month we took the girls in for duel check-up and vaccines.

Here are the stats:

Maddy's 3 year check up
39" ~ 90%
35 lbs ~ 95%

Clare's 15mo check up
31 1/2" ~ 75%
28.7 lbs ~ 95%

The Front Hall Bathroom

The hall bathroom is moving right along!!!
Once this one is done we will move on to the back hall bath.
The master is a work in progress....








Saturday, May 07, 2011

Kitchen Wall


The last of the walls in the kitchen have finally been put back up!!!

The sink was unhooked and removed so the
electrical could be finished and so Greg could run
some water over the the fridge for water and ice.
Yep. We haven't had ice since January and
we've been paying for our water for just as long.


Old cabinets are gone and my sink is now
on saw horses until our new cabinets come in.

Working with two little helpers.

Dry-wall up and taped. Mudding is started.

Looks like fun, huh?

The island wall is being built.

The cabinets are going on the inside of the
wall and the wall is there so we are able to
extend our counter out a bit further.
It's gonna be heavy, we're doing concrete counters!